Choosing the method is half the job. The wrong call costs a driveway, a lane closure or a struck line. Here is how we decide, and what each method is actually good for.
Trenchless
Directional drilling
Steerable bore under roads, driveways, canals and rail. Guided head, tracked profile, conduit pulled back in a single shot. Nothing above the path gets opened.
Best for: Long crossings, live pavement, mature landscaping, water bodies.
Trenchless
Missile boring
Pneumatic piercing tool for short crossings under sidewalks, curbs and yards. Fast, low footprint, ideal for service drops on a live street.
Best for: Short runs under a sidewalk, driveway or single yard.
Open cut
Trenching & plowing
Where the corridor is open and the soil allows, trenching and cable plowing move footage fast with full control of bedding, warning tape and compaction.
Best for: Open right of way, greenfield corridors, long straight runs.
Safety
Vacuum excavation
Soft digs and potholing to expose existing lines before we drill. Air or water spoil removal, no blade near a live conduit. This is how strikes stop happening.
Best for: Congested corridors, unclear locates, critical facilities.
Network
Conduit, cable & splice
Innerduct and microduct systems, hand holes and vaults, cable placement and pulling, splice enclosure support, OTDR testing coordination and as built records.
Best for: Every fiber build, from backbone to the service drop.
Close out
Restoration & MOT
Traffic control plans, lane closures, backfill and compaction, concrete and asphalt patch, sod and irrigation repair, final walk with the inspector.
Best for: Every job. The corridor goes back the way we found it.
Method selection at a glance
Method
Surface impact
Typical run
Where it wins
Directional drilling
None along the path
200 to 1,200 ft
Live pavement, canals, mature landscaping
Missile boring
Entry and exit pits only
20 to 100 ft
Sidewalks, driveways, single yards
Trenching / plowing
Full corridor opened
Unlimited
Open right of way, greenfield
Vacuum excavation
Small potholes
Spot verification
Congested or unclear utility corridors
Ranges are typical planning references, not commitments. Final method, depth and length come from the design, the soil, the permit and the utility owner's specification.
Cross section
What is actually under your street.
A residential corridor holds five separate utility systems in a few feet of soil. Our job is to add one more without touching any of them. Hover a color to isolate it.
Depths shown are illustrative. Actual cover is set by the utility owner's specification, the permitting agency and local code, and is confirmed by 811 locates and vacuum excavation before drilling.
Next step
Send us the footage. We will send you a number.
Scope, location and schedule are enough to start. Bid requests, subcontractor packages and job applications all land with a real person in Orlando.